San Antonio’s proposed drainage borrowing lifts Districts 1 and 7 to about 29% of district-assigned bond dollars; without that borrowing, their share is about 20%, almost unchanged from the 2022 proposal.
That difference sharpens the question behind Bexar.Report’s earlier look at the district split: Did the city shift its voter-bond plan toward these districts, or did a separate pool of drainage money change the comparison? The figures point to the second explanation.
From the record

What explains the larger share?
For residents of Districts 1 and 7, the proposal assigns $88.7 million in drainage borrowing to projects in their districts. The city’s presentation puts $50.1 million of that amount in District 1 and $38.6 million in District 7. Those are proposed allocations, not a measure of completed drainage work.
Together, the two districts account for 42.6% of the presentation’s $208 million in district-assigned drainage borrowing, by Bexar.Report’s calculation. That is a much larger share than their portion of the proposed voter-bond pool. Combining the two pools makes their overall share rise even though their voter-bond share barely changes.
What happens when drainage is set aside?
In the 2022 staff proposal, Districts 1 and 7 had about $142.2 million of about $723.3 million in district-assigned dollars, or 19.7% by Bexar.Report’s calculation. That historical comparison concerns a staff proposal, not a tally of projects ultimately built.
